January 24th, 2019, National Energy Policy Council (NEPC) has approved the PDP 2018 after public hearing has already been done. It is summarized that total country capacity at the end of 2017 was at 46,090
with GLOW on relevant issues to reflect all necessary changes in the contractual documentation including the adjustment of the tender price of GLOW ’s shares as a result of this additional condition
Competition 1.1 Electricity industry and Economic situation in Thailand In 2018, Thailand’s peak demand in Electricity Generating Authority of Thailand (EGAT)’s system was 28,338 megawatts, occurred on April 24
of Thailand (EGAT)’s system was 30,853 megawatts, occurred on May 2, 2019 at 10.27 pm, higher than the peak demand of 28,338 megawatts in 2018 by 8.9 percent while the peak demand in 3 power