acquisition completion on 26 March 2020 and increased revenue from electricity sales of Ichinoseki Solar Power 1 GK (ISP-1) due to higher light intensity than in Q2/2019. Besides, other income of Combine Heat
composites, such as wadding, insulation, filtration, automotive acoustic insulation material and other products where heat is used to bond the fibers. The HIAM plant is expected to start operations in 2019
250 237 (5%) (4%) 255 247 (3%) Management Discussion & Analysis Management Discussion & Analysis (MD&A) Q4/2017 and FY2017 ผลประกอบ การบริษัท Gross profit of the Combined Heat and Power Producing
. WATER SITUATION (CONT.) 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs 4. Transfer water from Klong Wang Tanoad, Chanthaburi to Prasae Reservoirs to maintain the water level
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
above. 6) GS can distribute water supply to user and reservoir can maintain an average water for distribution not less than 24,000 cubic metre per day and expected to be operated within the end of second
the area from May to July 2017, and additional raw water pumped from Bangpakong River into Bangpra reservoir. For Prasae reservoir water reserve was relatively below average since the company has been
lacated on Amphoe Tai Meang, Phang-Nga to use as reservoir for pruduce and distribute water supply to some part of Phuket and Phang-Nga. Currently, GS and HYDRO has applied for license that associated with
Baht because the company has stopped transferring water from Nongplalai reservoir to Chonburi area in consistent with the sufficient water supply in Chonburi area. Therefore; gross profit margin of raw
was under monitoring because of the dredging of Nongkho reservoir, while those of Rayong province was in moderate level. Water supply in the reservoirs was approximately lower than the average water