Facebook page "Clean Energy Saving" : Unlicensed securities and derivatives business (Disclosure Date : 19/01/2026)
Facebook อ้างชื่อ Clean Energy Saving - ยังไม่ได้รับใบอนุญาตธุรกิจหลักทรัพย์/สัญญาซื้อขายล่วงหน้า (วันที่เปิดเผยข้อมูล : 19/01/2569)
, harmonized packaging specification, and reduced bottle weight. - Osotspa maintained its strong leadership position in both energy drinks and functional drinks markets and played a major role as a market growth
projects in Vietnam, 3) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively and 4) interest cost saving. This was despite a 5.3% y-on-y
Che 1 and 2 solar projects in Vietnam, 2) ABP3’s improving heat rate after gas turbine upgrade in Dec 2018 - Jan 2019 and 3) interest cost saving. • NNP / NNP - owner of the parent increased 6.8% y-on-y
interest saving rate around 2.0% p.a. or Baht 119 million throughout the project life. This transaction also unleashed cash flow in the amount of Baht 84 million. Solarwa Project and TPS Commercial Project
share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total project value
Baht 100 per share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total
and in budget for 26 consecutive projects during the last 7 years. Investment in the industrial waste to energy power plant project In January 2018, B.Grimm Power announced the investment in the
Chaowanantakul 2) Mr. Peerayot Rujitess 3) Mr. Thaitawat Indratula 4) Mr. Jiruss Rianchaiwanich 5) Mr. Petcharat Taotong Business Type To provide the alternative energy supply and energy saving consultancy by