electricity from Ichinoseki Solar Power 1 GK (ISP1) and revenue from selling chilled water from Combine Heat and Power Producing Company Limited (CHPP). Cost of sales of goods and rendering of services Cost of
decreased in revenue from selling electricity of Ichinoseki Solar Power 1 GK (ISP1) as well as the seasonal decreased in revenue from Combine Heat and Power Producing Company Limited (CHPP) resulted from
light intensity resulting in higher generation of electricity. • Other income increased due to an increase in EPC service income of Combine Heat and Power Producing Company Limited (CHPP). Q2/2020 VS Q2
from Ichinoseki Solar Power 1 GK (ISP1) and the decrease in revenue of solar cell implementation service from Combine Heat and Power Producing Company Limited (CHPP) following the existing projects. The
increased by Baht 8 million as a result of the higher average electricity selling price. Also, the revenue from selling chilled water and electricity from Combine Heat and Power Producing Company Limited
Construction contract service (EPC) income of Combine Heat and Power Producing Company Limited (CHPP) as well as the increase in selling electricity of Ichinoseki Solar Power 1 (ISP1). However, the cost of sales
29 million or 44%. The increase was caused by the incline in natural gas consumption volume used in producing electricity and steam, as well as the price of natural gas. Q4/2017 VS Q4/2016 (YoY) • When
-kW floating solar installed at PTT Tank Terminal Company Limited in Map Ta Phut, Rayong. GPSC, as a power flagship of PTT Group, has commission Combined Heat and Power producing Company Limited (CHPP
matter. • Progress of construction plan for Rayong Central Utilities' expansion phase This project was previously named Central Utilities Plant 4 (CUP 4) whose construction is for producing electricity and
the agreement with PTTPL to be EPC for solar rooftop and BESS project On 13th July 2018, Combine Heat and Power Producing Company Limited (CHPP), in which GPSC has hold 100% stake, has signed the