infrastructure projects in support of national growth and regional linkage. Major infrastructure projects include Motorway Link to connect Thailand?s Western Seaboard and Myanmar?s Dawei Deep Seaport and
) 6.6 Asset Turnover (Time) 0.2 0.4 Leverage Ratio Debt to Equity (Time) 1.5 1.0 Interest Coverage Ratio (Time) (0.2) 1.0 22 ASIA’S BOUTIQUE AIRLINE Glossary Passenger or Cabin load factor : Number https
Eastern Seaboard NGD 2 project, scheduled to operate by 3Q2018. PERFORMANCE BY BUSINESS Utilities Business Revenue from Sales and Services from Utilities Business in 2017 of Baht 1,633.8 million has details
, Gulf WHA MT has 2 projects located at Hemaraj Eastern Seaboard Industrial Estate 2 and Hemaraj Eastern Seaboard Industrial Estate 4. The investment for each project is made through special vehicle
cuber meter per day. Reclaimed Water Project (RO) at WHA EIE achieved Commercial Operation Date in 3Q2018 with capacity of 7,500 cubic meter per day. Natural gas retail business, WHA Eastern Seaboard
obtained right to develop natural gas distribution and retail projects in six Hemaraj industrial estates, starting with the WHA Eastern Seaboard NGD 2 project, scheduled to operate by 3Q2018. PERFORMANCE BY
, based on average rate of commercial banks as published by Bank of Thailand on 7 August 2019). The share transfer was completed in end of October 2019 WHA Eastern Seaboard Industrial Estate 4 (WHANGD 4
rate of 0.0013 THB/VND, based on average rate of commercial banks as published by Bank of Thailand on 7 August 2019). The share transfer was completed in end of October 2019 WHA Eastern Seaboard
contracted steam capacity of 42 Ton/hour located in Eastern Seaboard Industrial Estate (“ESIE”), Pluakdaeng sub-district, Rayong province. Please be informed accordingly. Sincerely, (Mr.Wisate Chungwatana
year, is scheduled to achieve COD in 2Q2019 in WHA Eastern Seaboard Industrial Estate 3 Chonburi Clean Energy, an installed capacities of 8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW