Transaction Information Regarding Lease of Land lesser than 3-Year Period (Additional) 07/01/2022 08:58 Disclosure of Connected Transaction Information Regarding Lease of Land lesser than 3-Year Period 16/11
System Works of the Si Rat Expressway, the Si Rat - Outer Ring Road Expressway and the Udon Ratthaya Expressway 16/12/2020 18:28 Execution of Connected Transaction on Maintenance and Improvement of
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
Q1–2019, it increased in line with the increased in revenue. Comparing Q1–2019 and Q4–2018 showed that the increased rate of total operating expenses was much lesser than the increased rate of revenue
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
same period of last year. The increased net profit for year 2019 was mainly in respond to the product mix during the year and that the impacts derived from the currencies appreciation is at lesser level