3,130,000 17.75 4. Mr. Thanarat Possawong 2,500,000 14.18 Total 17,630,000 100.00 At present, The Megawatt Company Limited has a plan to invest in the solar power plant with the installed capacity of 360 MWp
, private investment slowed down as confidence in the election and the direction of investment from the government through large projects. In the first quarter of 2018, the Company installed and delivered the
installed for prompt usage. - The proposal of machine purchasing cost per one machine is 10,000,000 Baht, therefore, in total of 2 machines is 20,000,000 Baht. And one Knife grinding machine is 250,000 Baht
2. Mr. Somphop Prompanapitak 3. Mr. Peeranat Tantichattanont Registered capital : Baht 1,850 million Paid-up capital : Baht 1,850 million Type of business : Fully integrated energy business and
2020 The Company recognizes revenue from the production line installation project and the production line test for the whole system installation, which is expected to be installed in May 2020, resulting
installation of the production line and the testing of the production line in respect of the installation of the entire production line, which was installed successfully. In July 2020, the results of the
with another 3 investors namely, Millcon Steel Public Company Limited, Miss Pui Man Lee and Mr. Thanarat Possawong. On 30 June 2020, the Company has successfully achieved the agreement with those three
attributable to Owners of the Parent was Baht 2,267.8 million, a 61.2% increase from 2017. Significant Events in 2018: Gulf TS4, a installed capacities of 129.9 MW SPP, representing 32.5 Equity MW, ia
) and the levelized AP (accounting revenue). GNLL2, an installed capacities of 127 MW SPP, representing 32 Equity MW achieved COD in January 2019. WHAUP Nghe An Joint Stock Company (the Company’s
38.16 million or 68.15% from THB 56.00 million to THB 94.16 million. The recognition of license fee for products installed and growth in recurring services of HR Solution results in an increase in net