for the nation. Money from various budgets has been pulled back to help those who are affected by the outbreak. Entrepreneurs stop operating, resulting in lost sales target. For the first quarter of
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
operations of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
a building and the installation of electricity-generating machinery at the exaggerated price of 58 million baht. Nongree Power Plants, approved by Mr. Bhusana, paid for the first instalment of 12.48
Production and Installation machine business. 2. Eureka Design International Pte,.Ltd. (Singapore) , Investment in overseas business. This disposition is considered as the assets disposition transaction of
Production and Installation machine business. 2. Eureka Design International Pte,.Ltd. (Singapore) , Investment in overseas business. This disposition is considered as the assets disposition transaction of
and installation of the pipeline 239.05 248.60 (3.84) Income from water production and distribution 31.25 24.31 28.55 Income from installation and distribution of water production systems 3.40 25.03
provides food court system solution, including installation and maintenance services 4. The Company's group provides payment solutions and e-money Top 10 Major Shareholders(@09 Mar 2022) Share % 1. MR