that Thailand's 2020 GDP will fall by -6.7%, which is close to the Tom Yam Kung crisis. There are measures to stop living at home to stop the infection to stop the transmission of the corona virus 2019
installation of the production line and the testing of the production line in respect of the installation of the entire production line, which was installed successfully. In July 2020, the results of the
to install electricity transmission network with total project value of Baht 125.00 million. Under the contract, the project was due to complete in February 2018. Nevertheless, during installation, the
a building and the installation of electricity-generating machinery at the exaggerated price of 58 million baht. Nongree Power Plants, approved by Mr. Bhusana, paid for the first instalment of 12.48
account from the delayed project Baht 56.85 million had the detailed explanation as follows:- In November 2015, the Company was hired as a contractor to install electricity transmission network with total
and installation of the pipeline 239.05 248.60 (3.84) Income from water production and distribution 31.25 24.31 28.55 Income from installation and distribution of water production systems 3.40 25.03
Quarter 1/2020 Quarter 1/2019 Changed (%) Income from sale pipe 253.61 222.65 13.91 Income from installation pipe 54.41 16.40 231.77 Incomes from the water management business - Sales and service of water
and installation of the pipeline 269.18 227.86 18.13 Income from water business 54.63 36.54 49.51 Other income 3.32 5.05 (34.26) Total revenues 327.13 269.45 21.41 Cost from sale and installation of the
; Overall of the 9 months of year 2018, sale and installation of the pipeline business was adversely affected by purchasing from pipe laying projects; waiting for bidding, waiting for contract signing, and
(%) Income from sale and installation of the pipeline 255.35 260.76 (2.07) Income from water business 47.53 72.10 (34.08) Other income 25.90 4.19 518.14 Total revenues 328.78 337.05 (2.45) Cost from sale and