advanced procurement of raw materials with Union Gas and Chemicals Co., Ltd. in 2004, and made a false representation of accounting information. The public prosecutor issued a non-prosecution order. The case
for advanced procurement of raw materials with Union Gas and Chemicals Co., Ltd. in 2004, and made a false representation of accounting information. SEC Act S.307 311 312 313 Criminal Complaint
acquisition completion on 26 March 2020 and increased revenue from electricity sales of Ichinoseki Solar Power 1 GK (ISP-1) due to higher light intensity than in Q2/2019. Besides, other income of Combine Heat
the successful pilot project, ABP3, completed in January which enhanced the performance of gas turbine [to lower the heat rate of the power plant, shorten the maintenance period (or add operating days
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
performance of gas turbine [to lower the heat rate of the power plant, shorten the maintenance period (or add operating days) by 5-10 days and add capacity by 7 MW], its efficiency improvement was already
enhance heat rate of gas turbine as well as overall power plant performances 3. Digitalization – to predict the degradation of each machine more accurate. Consequently, each plant will be able to minimize
composites, such as wadding, insulation, filtration, automotive acoustic insulation material and other products where heat is used to bond the fibers. The HIAM plant is expected to start operations in 2019
allowance for asset impairment amounting to Baht 31 million for Combined Heat and Power Producing Company Limited (CHPP) to be disposed. When comparing to Q1/2017, non-operating income and expenses decreased
the agreement with PTTPL to be EPC for solar rooftop and BESS project On 13th July 2018, Combine Heat and Power Producing Company Limited (CHPP), in which GPSC has hold 100% stake, has signed the