our key products and strong margins, even carrying forward into the second quarter, driven at first by recovery in China. Global inventory levels are tight and combined with supply chain shocks are
gas-fired combined cycle cogeneration power that commenced COD on February 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The Project was able
support and grow together with us. Commercial operation of ABPR5 From a total of 3 SPP power plants in Amata City Industrial Estate that have scheduled COD in 2018, ABPR5 is the third gas-fired combined
Analysis For the Three-month and Six-month Periods Ended 30 June, 2017 Page 1 (Translation) 1. Significant events of the 2 nd quarter of 2017 1.1 The participation in the Investment in Riau Combined-Cycle
for each project, currently set at 500 million baht, will be lifted. Combined investment of an infrastructure fund in all power plant projects must be not less than 2 billion baht.If an
combined installed capacity of 31 MW and sells all electricity to PEA and MEA under a 25-year PPA. These projects were able to achieve COD as scheduled in PPA while the construction cost was also in line
with the budget approved by the lenders. This achievement would enable us to keep record of managing the project to commence COD in time and in budget for 25 consecutive projects during the last 6 years