and projects 135.76 149.38 Air-conditioning and sanitary products 21.36 12.22 Refrigeration systems 65.54 - Digital printing systems 70.14 - The segment of gross profit by business. (Unit: Million Baht
Fire protection systems and projects 159.24 165.58 Air-conditioning and sanitary products 21.03 13.04 Refrigeration systems 89.22 - Digital printing systems 75.20 - 344.69 178.62 The segment of gross
27%, those were resulting from sales and service income from the business. Ice Machine and Industrial Refrigeration increased 515 MB or 22%, Machinery for Liquid and Food increased 435 MB or equivalent
18% because the sales volume of chilled water increased by 831 thousand Refrigeration-tons or 15% due to the higher temperature in Q1/2018 than in Q4/2017 that caused the increase in chilled water
/2017 because the sales volume of chilled water slightly increased for 568 thousands Refrigeration-ton or 9% as the weather was becoming warmer. Furthermore, the price of chilled water rose following the
) • Revenue in Q3/2017 rose by Baht 7 million or 13% from Q2/2017 because the sales volume of chilled water increased for 434 thousands Refrigeration-ton or 6% as there were more events held at the Government
chilled water decreased by 1,908 thousands Refrigeration-ton or 26% due to the lower temperature in Q4/2017 that caused the decrease in chilled water consumption. • The cost of sales of goods and rendering
วนของระยะเวลาการมีผลใชบังคับ ของแบบ filing (“cooling-off period”) เห็นควรกําหนดระยะเวลา cooling-off period สําหรับ Infra Trust Bond โดยคํานึงถึงระยะเวลา cooling-off period ในการเสนอขายหนวยทรัสตประกอ
share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total project value
Baht 100 per share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total