and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
Q3/2017 Description Amount % Amount % More (Less) Amount % Average Capacity Utilization 67.27% 65.05% 2.22% Revenue from sales 343,319 100.0% 322,926 100.0% 20,393 6.3% Cost of sales (272,144) (79.3
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
Expressway and Metro Public Company Limited (“the Company”) was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) with total of Baht 10,000 Million with floating interest rate
growth of approximately 2.9% in THB terms, while sales revenue in USD terms grew by 6.7%. The increase was primarily due to an increase in capacity utilization at Phase 3 at the new plant, and an increase
Q2/2019 compare with Q2/2018 Description Amount % Amount % More (Less) Amount % Average Capacity Utilization 69.90% 70.53% (0.63%) Revenue from sales 355,059 100.0% 354,526 100.0% 533 0.2% Cost of