No UN/SET/HO/A61/011503 15th January 2018 Subject: Clarification of the Connected Transaction in the company’s asset disposal Attention: President of the Stock Exchange of Thailand Unique Engineering
structure from 1 April 2020 to strengthen the business for the group in terms of Efficiency, Availability and Reliability in delivering electricity and steam, as well as focusing on synergy in the operation
gas-fired combined cycle cogeneration power that commenced COD on February 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The Project was able
REIT (“CPNREIT”) in December 2017, and the increase in utility cost due to the increase in electricity Ft rate since May 2017. CPN continues to emphasize on effective revenue generation through new
PEA tariff of which Ft is a major component. With situation of a stable gas price this year if Ft trends is continuous to increase, it would be favorable to our operating margin, i.e. electricity sales
before Interest, Taxes, Depreciation and Amortization EDL = Electricite Du Laos EGAT = Electricity Generating Authority of Thailand ERC = Energy Regulatory Commission EPC = Engineering, Procurement and
information for any purpose. For further detail, please contact Investor Relations Division of the Electricity Generating Public Company Limited (EGCO) at Tel: 662-998-5150-3 or Email: ir@egco.com mailto:ir
) successfully started commercial operation in October 2018. Therefore, total installed capacity of 3 SPP power plants which started commercial operation in 2018 is 399 MW which sell electricity to EGAT at 270 MW
the Small Power Producer (SPP) scheme, and reliable cash flows from long-term power purchase agreements (PPAs) with the Electricity Generating Authority of Thailand (EGAT) and reputable clients. (Please
combined cycle cogeneration power that commenced COD on June 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as