tower, design and distribute steel structure according to the drawing, power distribution and heat energy business, construction and tunneling contractor and distribution of industrial products. In the
limiting disclosure of such password to the relevant authorized staff only; (3) determining a control system for drawing or using hardcopy forms relating to securities trading or reimbursement such as cheque
limiting disclosure of such password to the relevant authorized staff only; (3) determining a control system for drawing or using hardcopy forms relating to securities trading or reimbursement such as cheque
construction drawing amendment. The total values of trade receivables under the concession agreement and intangible assets as ended December 31, 2018 were Baht 12.29 million and Baht 4.43 million, respectively
Project in Myanmar: It is the Build Own and Transfer (BOT) one of which the construction has been commenced and waiting for an approval of some construction drawing amendment. The total values of
business is construction work which has all scope of work on Engineering drawing, Procurement machine and equipment, and Construction management to serve all client requirement in every construction process
Group’s business is construction work which has all scope of work on Engineering drawing, Procurement machine and equipment, and Construction management to serve all client requirement in every construction
million baht respectively. The financing part was net Baht -162.52 million by drawing up short term loan 56.40 million to settle trade creditors and payment of dividend by Baht -218.92 million. In total
been commenced and waiting for an approval of some construction drawing amendment. The total values of account receivables under the concession agreement and intangible assets as ended June 30, 2018 were
) one of which the construction has been commenced and waiting for an approval of some construction drawing amendment. The total values of trade receivables under the concession agreement and intangible