- EPC Service 41.23 243.83 (202.60) (83.09) - Structure Mechanic and Pinging (SMP Service) 152.55 53.34 99.21 185.94 - Civil & Building Services 100.78 74.84 25.94 34.65 - Fabrication and Other services
Reconfiguration project for Platform and Ladder Fabrication (design, manufacture of steel floor structures, steel stairs and railings) the contract value of 89.43 Million Baht. Cost of construction contracts The
Piping (SMP) and Electrical and Instrument service, 3. Civil and Building service. 4. Fabrication and Other service. For the Group’s 2017 operation ended 31 December 2017 could summarize as follows
Mechanical Piping (SMP) and Electrical and Instrument service, 3. Civil and Building service. 4. Fabrication and Other service. For the Group’s 2017 operation ended 31 December 2017 could summarize as follows
225 million Baht, partial by increasing capital through Unimit (Hong Kong) Co., Limited and by loan. Detail as following : 1. Date of Transaction The Company plan to construct fabrication plant mainly
Service 202.07 100.78 101.29 100.51 - Fabrication and Other service 93.22 119.78 (26.56) (22.17) Cost of construction contracts (561.51) (368.25) 193.26 52.48 Gross profit 50.32 46.09 4.22 9.15 Other income
Services) 228.47 162.77 65.70 40.36 519.87 315.33 204.54 64.87 - Civil & Building Service 212.36 114.95 97.41 84.74 414.43 215.72 198.71 92.11 - Fabrication and Other service 116.03 92.93 23.10 24.86 209.25
Service 563.97 550.23 13.74 2.50 - Structure Mechanic and Pinging (SMP Service) 343.49 359.85 (16.36) (4.55) - Civil & Building Services 341.86 86.67 255.19 294.45 - Fabrication and Other services 137.77
540.30 341.86 198.44 58.05 - Fabrication and Other service 281.46 137.77 143.69 104.30 Cost of construction contracts (1,851.87) (1,241.09) 610.78 49.21 Gross profit 182.59 145.99 36.59 25.06 Other income
Services) 162.77 79.06 83.71 105.89 315.33 132.40 182.93 138.16 - Civil & Building Services 114.94 84.08 30.86 36.72 215.72 158.92 56.80 35.74 - Fabrication and Other services 92.94 5.88 87.06 1,480.78