them, and (2 ) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the community. Therefore, it is not
them, and (2 ) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the community. Therefore, it is not
. 57894 and 61177, Tambon Mueang Kao, Amphoe Mueang Khon Kaen, Khon Kaen, with the total land area of 309 square wah, together with a buildings at No. 67 Moo 8, Lao Nadee Road, Tambon Mueang Kao, Amphoe
99.99 percent of total paid-up capital of HYDRO. The contract is for a period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai
, has unan 94 and 6117 al land area Tambon M o NML Co. g assigned form any ac and negot nt, applicat nd Building f Lands, Lan propriate, a and Building e: the transa n dated 13 ferring of th he Company
operation in GS. The area under the water supply contract has high water requirements. This area is full of the community, tourist attraction, and industrial factory which currently suffers from the shortage
, lower central region and southern region will contribute to solving current traffic problem. According the concept of the Minister of Transport for contribute to solving in the area of Rama2 Road. The
period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai lacated on Amphoe Tai Meang, Phang-Nga to use as reservoir for pruduce and
period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai lacated on Amphoe Tai Meang, Phang-Nga to use as reservoir for pruduce and
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the