Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 21/04/2011
Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 11/05/2011
Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 22/07/2011
Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 10/08/2011
, electrical charging and hydrogen refuelling installations for personal mobility devices. Rail transport: for electrified trackside infrastructure and associated subsystems: infrastructure, energy, on-board
. Rail transport: for electrified trackside infrastructure and associated subsystems: infrastructure, energy, on-board https://www.sec.or.th/TH/Documents/LawsandRegulations/ResourceCenter
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
takes less transportation time for them, and (2) the neighboring community receives waste water from similar power plants located in the same area, some of which transport their waste water to the
in the same area, some of which transport their waste water to the community. Therefore, it is not necessary for the community to retrieve the waste water directly from the project. Due to such event
personal mobility devices. Rail transport: for electrified trackside infrastructure and associated subsystems: infrastructure, energy, on-board https://www.sec.or.th/TH/Documents/LawsandRegulations