) 6.20 4.15 (80.52) Due to the water supply situation in Chonburi and Rayong being lower than average, the Company has put in place the following water shortage mitigation measures: 1. Request customers
shortage mitigation measures: 1. Request customers use water more efficiently, and jointly set a demand reduction of 10% during the drought 2. Control water withdrawal from Dokkrai and Nongplalai Reservoirs
of additional storage space as the existing facilities was not enough. 4.2 Category of Connected Transaction Connected transaction related to asset acquisition. 2 4.3 Details of asset a. Two units of
structured storage tent having a total storage area of 691 square meters. 4.4 Transaction Objective The acquisition of clean rooms and storage facilities will help add value to our manufacturing facilities as
when no longer required; 2.3 consider risks of media degrading while stored information is still needed and methods on how to handle such risks in case of prolonged storage; 2.4 keep all media in a safe
for LPG storage tanks and non-pressure tanks on a leased land, located in Thilawa Special Economic Zone near Yangon, Myanmar. Expected project schedule is one year start from early next year and
is made. The storage of such document or evidence shall be made in the manner which is immediately available upon the Office’s request for a review or an inspection. Clause 4 This Notification shall
is made. The storage of such document or evidence shall be made in the manner which is immediately available upon the Office’s request for a review or an inspection. Clause 4 This Notification shall
that towards the end of the year and into 2021 demand should increase. In other segments, disruption in cross border logistics is the key concern and once mitigation efforts are in place we should return
million, increased 41.4% over the same period last year and increased 21.0% over last quarter due to strong customer demand in cloud storage and data center-related products such as Critical Infrastructure