Excavation 3 Soil and Coal Milling Project at Mae Moh Mine, Contract No.6 decreased. Due to heavy rain in the project area, the operation could not be done at full capacity resulting in the loss from regular
and electronic sector, while non-durable goods sector was marginally increase. Domestic demand slowly improved in all sector as regular income. As a result, domestic industries expanded and business
operation in GS. The area under the water supply contract has high water requirements. This area is full of the community, tourist attraction, and industrial factory which currently suffers from the shortage
operating revenue due to the temporary closure of branches from the impact of COVID-19 outbreak as well as the closure of service area for renovation in some stores. • The Company’s gross profit in Q2/2021
Industrial Estate with approximate area of 80 Rais for the construction of BGPR1 and BGPR2 SPP projects, with the lease terms covered throughout operating period of the project. (2) ABPR1R and ABP2R, the
99.99 percent of total paid-up capital of HYDRO. The contract is for a period of 30 years. The Project, production and distribution of water supply, has water sources from old mine area about 340 Rai
wave of COVID-19, as well as expanding food delivery service points to have higher area coverage • Focusing on increasing pop-up stores instead of establishing new dessert café branch as it requires
. However, people still have anxiety about the widespread of COVID-19 which affect the decision in going to the hospital, led to a significant decrease in regular patient traffic compared to the same period
great emphasis on effective revenue generation from new malls, asset enhancement, coupled with efficient operating costs management. Currently, CPN manages 30 shopping malls with the net leasable area
in the central business area. The strategy of the Company has thus been adjusted to be in line with the market condition and business. The Company has turned to the rental market as a measure of risk