million due to corresponding to EGAT’s dispatched instruction resulting in higher fuel consumption. • Small Power Producer (SPP): The gross profit increased by Baht 2,115 million as a result of the first
future growth plans. In terms of the progress on Tender Offer of Glow Energy Public Company Limited (GLOW), after the company have completed the Mandatory Tender Offer from GLOW which ended on the 22nd May
Authority of Thailand (EGAT) because of the reserved shutdown following EGAT dispatch instruction; IRPC Clean Power Phase 1 (IRPC-CP Phase 1) ceased the gas turbine generator to commissioning with Phase 2 in
ACC6207/003 25 July 2019 Subject Inform the progress of the sale stock in the subsidiary company To Director/ Managing Director The Stock Exchange of Thailand Refer to the company's letter No
(EGAT) per EGAT’s dispatch instruction, the gross profit increased by Baht 52 million or 36% from Q1/2017 from the increase in the Availability Rate and the Weight factor. • Rayong Central Utilities Plant
, increased by Baht 11 million or 3% compared to the first half of 2017 due to the decrease in hourly operating maintenance cost followed lower dispatch volume according to EGAT’s instruction. Sriracha Power
future projects. In terms of the progress on Delisting Tender Offer of GLOW, the process was completed on 2 December 2019 and GLOW has been delisted from being listed on the Stock Exchange of Thailand on
million or 57% from Q3/2017. The electricity dispatched volume in Q3/2018 was higher because of the reserved shutdown according to EGAT’s instruction of Sriracha Power Plant in Q3/2017. Also, the increase
and the operation that is working accordance to the plan, to increase the proportion of renewable energy of the company. Progress of the Solar Power Plant Product in Thailand As of 16 January 2020, the
Q1/2018 and Q1/2017, the cost decreased by 158 million or 4% due to the lower usage of natural gas of Sriracha Power Plant which is in-line with the decrease in volume dispatch per EGAT’s instruction