2.1.3 inappropriate/insufficient disclosure of information (paragraph........). ฆ 2.2 Inability to obtain sufficient appropriate audit evidence and the possible effects are material, but not pervasive
and Metro Public Company Limited was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project with total of Baht 10,000 Million with floating interest rate by issuing debentures with
Company Limited (“the Company”) had refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) for total of Baht 10,000 Million with floating interest rate by issuing debentures with
or 1.3 percent, mainly from the increase in toll revenue from the Si Rat-Outer Ring Road Expressway Project (SOE). In the year 2019, SOE average traffic volume was at 64,253 trips/day representing an
agreement with the Expressway Authority of Thailand (EXAT) on July 19, 2017 for the construction of the Connection between Si Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana
Rat-Outer Ring Road Expressway and Si Rat Expressway (heading to Chaeng Watthana) for the period of approximately 18 months. (Translation) Bangkok Expressway and Metro Public Company Limited Management
Limited entered into an extension of the concession agreement with the Expressway Authority of Thailand ( EXAT) on July 19, 2017 for the construction of the Connection between the Si Rat-Outer Ring Road
Expressway and Metro Public Company Limited (“the Company”) was refinanced long term loans for the Si Rat-Outer Ring Road Expressway Project (SOE) with total of Baht 10,000 Million with floating interest rate
. According to IGE and subsidiaries business plan evaluation as of 2018 is possible and benefit to company. However, impairment loss of investment in IGEN Engineering Company Limited of 83.14 million baht would
under Clause 2 such as date of occurrence and cause of such circumstance; (3) measure for solving possible effect on REIT in case of the circumstance occurred under Clause 2(1); (4) any other information