Authority of Thailand (EGAT) because of the reserved shutdown following EGAT dispatch instruction; IRPC Clean Power Phase 1 (IRPC-CP Phase 1) ceased the gas turbine generator to commissioning with Phase 2 in
Pipeline Project Phase I (Bang Pa- in-Phichit) of FPT during the second quarter of 2019, resulting in the Group recognizing operating costs of depreciation and interest expenses of the project that started
Baht 354.51 million, which was increased of Baht 41.44 million or 11.69 percent. As a result of effective ownership transferring was increased. These include Baan Pha Piyarom Niva, Natureza Phase 2, Baan
compared to the year 2018 by 12.65% due to the transfer of ownership of condominiums Aspen Condo Phase B more than Aspen Condo Phase A, in which the Aspen Condo Phase B is lower in cost than the Aspen Phase
of IRPC Clean Power Phase 2 (IRPC-CP Phase 2) in November 2017, in which GPSC holds 51% equity, has expanded the electricity generating capacity allowing the company to increase the volume of
Transportation Project (Phase 1) started operations during the Q2/2019. And for the first six months of 2019, the growths of multi-products fuel transportation volume was increased by 0.5%(y-o-y). * Note: Total
million or 44.19 percent, Because of Land awaiting development and the completed project as follow ; Chatuchot and Don Wai 2. Tax expenses The Company and its subsidiaries' tax expenses was increased Baht
multi- products fuel pipeline expansion project to the northern of Thailand (phase 1 or NFPT-phase1) . The Gross profit margin of the Group was of 54.1% compared to 59.0% of Q3/2018. While in the nine
gradually reduced in accordance with the payment schedule. While the interest arising from the loans for investment in the second phase of Hydrant pipeline system expansion project at BKK of TARCO and NFPT
Group have been gradually reduced in accordance with the payment schedule. While the interest arising from the loans for investment in the second phase of Hydrant pipeline system expansion project at BKK