Limited Management’s Discussion and Analysis (MD&A) for year 2018 any improving of the consumption of steel in this quarter. In addition, the Company has move the annual shut down early to February due to
/2019 2 G J Steel Public Limited Management’s Discussion and Analysis (MD&A) for year 2018 (Revised) any improving of the consumption of steel in this quarter. In addition, the Company has move the annual
increased by 609.18 million baht or 55.61% from 1,095.42 million baht in Q2/2019 to 1,704.60 million baht in Q2/2020 because of the promotion campaign in ready to move-in projects in Q2/2020 including the
million metric tons, increasing 11.52% consisting of Hot Roll Coil and Sheet (thin gauge) at 0.707 million metric tons, increasing 14.57% and Thick gauge (Plate) at 28.2 thousand metric tons, decreasing
in MAESTRO 07 Victory Monument which completed construction in end of 2018 and other ready to move in projects such as M Jatujak, MAESTRO 03 Ratchada-Rama9, MANOR Sanambinnam due to sales promotions
mainly from ready to move-in projects while there were 3 low-rise projects, Maestro 03 Ratchada-Rama9, Maestro 14 Siam-Ratchathevi and Maestro 01 Sathorn-Yenakat, completed and started transfer in Q2/2018
% consisting of thin gauge at 2.50 MT, decreasing 21.69% and Thick gauge at 0.127 MT, decreasing 29.59% compared to the same period of previous year. GJS บริษัท จ ีเจ สตีล จํากดั (มหาชน) G J Steel Public Company
Hot Rolled Steel production in Q2/2017 was at 0.621 million metric tons, increasing 1.31% consisting of thin gauge at 0.592 million metric tons, increasing 8.70% and Thick gauge at 29.8 thousand metric
The Hot Rolled Steel production in Q3/2017 was at 0.814 million metric tons, increasing 18.36% consisting of thin gauge at 0.786 million metric tons, increasing 21.94% and Thick gauge at 28.2 thousand
at 2.92 million metric tons, increasing 9.28% consisting of thin gauge at 2.72 million metric tons, increasing 8.68% and Thick gauge at 0.206 million metric tons, increasing 17.82% compared to the