-Chien - Mr. Yen, Ming-Shan - Miss. Wu, Ping-Yi Type of transaction Technical Cooperation Agreement, is given by service providers. It’s technical data included design, design standardization, formula
- Miss. Wu, Ping-Yi Type of transaction Technical Cooperation Agreement, is given by service providers. It’s technical data included design, design standardization, formula instruction, procedure and
. Yen, Ming-Shan - Miss. Wu, Ping-Yi Type of transaction Technical Cooperation Agreement, is given by service providers. It’s technical data included design, design standardization, formula instruction
gas decreased by Baht 343 million corresponding to EGAT’s lower dispatch instruction from Sriracha Power Plant. • The total cost of sales of goods and rendering services of Small Power Producer (SPP) in
Eureka Design Public Company Limited 19 Moo 11 Tambon Ladsawai, Amphur Lamlukka, Pathumthani 12150, Thailand Tel : +66(0) 2192 3737 Fax : +66(0) 2192 3741-44 www.eurekadesign.co.th No. ED-MD19-013
Eureka Design Public Company Limited 19 Moo 11 Tambon Ladsawai, Amphur Lamlukka, Pathumthani 12150, Thailand Tel : +66(0) 2192 3737 Fax : +66(0) 2192 3741-44 www.eurekadesign.co.th No. ED-MD19-013
Eureka Design Public Company Limited 19 Moo 11 Tambon Ladsawai, Amphur Lamlukka, Pathumthani 12150, Thailand Tel : +66(0) 2192 3737 Fax : +66(0) 2192 3741-44 www.eurekadesign.co.th No. ED-MD19-013
, resulting in higher revenue recognition together with the increase electricity sales volume corresponding to EGAT’s dispatch instruction and the decrease in maintenance cost as a result of the expiration of
Power Producer (IPP) increased by Baht 790 million as a result of no maintenance shutdown in Q1/2020 for Sriracha Power Plant and higher dispatch volume according to EGAT instruction resulting in higher
million or 57% from Q3/2017. The electricity dispatched volume in Q3/2018 was higher because of the reserved shutdown according to EGAT’s instruction of Sriracha Power Plant in Q3/2017. Also, the increase