Sriracha Power Plant, the gross profit slightly decreased by Baht 19 million due to higher natural gas consumption corresponding to EGAT’s dispatched instruction. • Small Power Producer (SPP): The gross
instruction from Sriracha Power Plant that decreased by 313 GWh, causing natural gas cost to decrease corresponding to the lower volume. • The cost of coal decreased by Baht 94 million as a result of the lower
rendering services of Independent Power Producer (IPP) decreased by Baht 91 million mainly due to the lower cost of natural gas corresponding to EGAT’s lower dispatch instruction from Sriracha Power Plant as
increased by Baht 471 million or 77%. This is mainly due to the increase in natural gas cost of Baht 439 million or 85% as a result of the increase in the electricity dispatch volume per EGAT’s instruction
Producer (IPP) increased by Baht 2,037 million mainly from the increase in natural gas consumption corresponding to EGAT’s dispatch instruction from Sriracha Power Plant despite the decrease in average
natural gas according to EGAT’s dispatched instruction, together with higher natural gas prices. Q3/2018 VS Q3/2017 (YoY) • The cost increased by Baht 898 million mainly because the natural gas cost moved
Q1/2018 and Q1/2017, the cost decreased by 158 million or 4% due to the lower usage of natural gas of Sriracha Power Plant which is in-line with the decrease in volume dispatch per EGAT’s instruction
increased by Baht 129 million or 19% because of the increase in selling price resulted from the increase in the Ft rate as well as the Weight factor in conjunction with the low cost of natural gas when
Authority of Thailand (EGAT) because of the reserved shutdown following EGAT dispatch instruction; IRPC Clean Power Phase 1 (IRPC-CP Phase 1) ceased the gas turbine generator to commissioning with Phase 2 in
by Baht 704 million or 65% from lower natural gas consumption following EGAT’s dispatch instruction and major overhaul maintenance shutdown. • The average price of natural gas rose by 335 Baht per