year, is scheduled to achieve COD in 2Q2019 in WHA Eastern Seaboard Industrial Estate 3 Chonburi Clean Energy, an installed capacities of 8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW
are scheduled to achieve COD on 2019. VSPP, WHA KM.3 Solar with a total contracted capacity of 0.9 Equity MW, is scheduled to achieve COD in May’18. Another VSPP, Waste to Energy project under
. Chonburi Clean Energy, a installed capacities of 8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW, is scheduled to achieve Commercial Operation Date in 4Q2019. Power plant Type of power
had signed new 8.3 MW, total accumulated capacity in pipe line are 19.7 MW which are under construction and scheduled to achieve COD in 3Q2019-1Q2020. Chonburi Clean Energy, an installed capacities of
Water sales volume increased by 6.0% YoY mainly from COD of Gulf VTP Power Plant in May 2017. 3 c. 3 additional SPPs currently under construction are scheduled to achieve COD in 2017. We expect the
358.9 -6.8% 1,032.2 897.8 15.0% - SPP 186.3 86.6 115.1% 513.0 198.8 158.0% - Alternative Energy 1.2 1.5 -21.5% 4.0 5.0 -21.7% - Power Plants under Constuction and Development (3.3) (7.9) -58.1% (9.8
which are under construction and scheduled to achieve COD in 4Q2019-2Q2020. Chonburi Clean Energy, an installed capacities of 8.6 MW Waste to Energy Power Plant, representing 2.9 Equity MW, is scheduled
, respectively. VSPP, WHA KM.3 Solar with a total contracted capacity of 0.9 Equity MW, is scheduled to achieve COD in 1Q’18. Another VSPP, Waste to Energy project under construction phase, namely Chonburi
opportunities to invest in renewable energy projects in India and Taiwan as the board has approved the business strategies to expand renewable energy portfolio to achieve target of 30% by 2026. Page 5 Thailand 69
Equity ratio stood healthily at 0.62x. Sbsequent Event: Gulf TS3, the 4th Joint Ventures SPP between WHA Energy Company Limited (a wholly owned subsidiary of WHAUP) and Gulf MP Company Limited at