COVID-19 pandemic, we have adopted measures to ensure stability and continuity of our electricity and utilities supply system. In terms of business expansion, GPSC focuses on expansion of investment in
continuity of our electricity and utilities supply system such as implementation of Business Continuity Plan (BCP) and Work from home arrangement for supporting staff and preparation of safe house for field
Utilities Plant increased after the main customers resumed normal operation from the scheduled maintenance in Q2/2017 even though Sriracha Power Plant had lower dispatch volume to Electricity Generating
improved only by 0.6% due to the low temperature, off-season rain and the hot storm in some areas in the first quarter of 2018 together with the increase in Independent Power Supply (IPS). The peak
(EGAT) per EGAT’s dispatch instruction, the gross profit increased by Baht 52 million or 36% from Q1/2017 from the increase in the Availability Rate and the Weight factor. • Rayong Central Utilities Plant
the year award (2019), in the category of Treasury, Trade, Supply Chain and Risk Management from ‘The Asset’ magazine, which is the leading business and financial magazine in Asia. The award reflects
management especially from the Cogeneration power plants. Although in 2017, the Sriracha Power Plant had lower dispatch volume to Electricity Generating Authority of Thailand (EGAT) compared to 2016 due to the
to a 20 years power supply agreement which is extendable for up to an additional 5 years. The construction of the project has progressed 93.69% (The construction plan was 92.41%). The commercial
completed and after studying the demand of lithium-ion batteries, shows that the demand will exceed the capacity of supply where the main customer group will be the System Integrator which will use this
(gross) supercritical coal-fired power plant, which will be co-located at the same campus of the existing 630 MW (2x315) plant Unit1-2 in Zambales province, Luzon of the Philippines. Power Supply