security 6 8.2.4 Readiness of computer systems, network, equipments and backing up and recovery of important data, whereby it is able to recover the latest data as specified from equipments or storing
unit with heat rate of 7,400 BTU/kWh, where the operator will be able to build a new power plant to replace the existing one at the same location or to refurbish the existing power plant. However, if the
$/BBL, attributed to the US backing out of the Iran Nuclear Deal and announcing new rounds of sanctions on Iran, combined with the global oil market that tightened after OPEC’s continual pursuit of its