Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 21/04/2011
Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 11/05/2011
Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 22/07/2011
Offeror : (1) Hitachi Transport System (Thailand) Pte. Ltd. (2) Hitachi Transport System (Asia) Pte. Ltd. | Date of submission of the Statement of Intention : 10/08/2011
the arrangement of information technology system to support IT audit, and a summary of the business and compliance system. The revision is a result of the workshop on consideration of application for
the arrangement of information technology system to support IT audit, and a summary of the business and compliance system. The revision is a result of the workshop on consideration of application for
), together with Mr. Krittiphat Ittisanyakorn (formerly named Mr. Pattarapob), then acting managing director and executive director, jointly made a fraudulent arrangement for KC to offer the 25 B/E issues at
arrangement for KC to offer the 25 B/E issues at a value ranging from 25 to 150 million baht each, and then misappropriated the proceeds by counterfeiting the company’s meeting documents, jointly opening a bank
, electrical charging and hydrogen refuelling installations for personal mobility devices. Rail transport: for electrified trackside infrastructure and associated subsystems: infrastructure, energy, on-board
. Rail transport: for electrified trackside infrastructure and associated subsystems: infrastructure, energy, on-board https://www.sec.or.th/TH/Documents/LawsandRegulations/ResourceCenter