Baht to 66.02 Million Baht or 13.95%, due to corporate marketing and sales alignment. 2. Our net loss for Q3 is 3.17 Million Baht compare to net loss 5.32 Million Baht Q on Q, due to decreasing in
strategy, especially in energy investments. The construction of our second Japan solar farm of 10.57MW in Japan is progressing well with confirmed expected commissioning in the 3rd Quarter of 2017. The PDI
year. The major renovation at CentralWorld is progressing as planned. The major renovation at CentralWorld is progressing as planned. In 1Q18, CPN curbed its renovation work during January and February
service Cost was 564.4 MB, an increase by 62.7 MB or 12.5% y-o-y is in alignment with the growth sale trend. The Company can control the cost of materials and labor costs in effectively, which results in an
alignment with the growth sale trend. The Company can control the cost of materials and labor costs in effectively, which results in an increase in gross profit compared to the same period last year and
growth shrimp frozen’ s purchase order. Cost Cost of sales and service Cost was 140.5 MB, an decrease by 0.05 MB or 0.04% y-o-y is in alignment with the growth sale trend. The Company can control the cost
additional income from contract manufacturing. Cost Cost of sales and service Cost was 279.4 MB, an increase by 5.7 MB or 2.1% y-o-y is in alignment with the growth sale trend. The Company can control the cost
the Company has additional income from contract manufacturing. Cost Cost of sales and service Cost was 415.9 MB, increased by 5.1 MB or 1.2% y-o-y is in alignment with the growth sale trend. The Company
by the end of 2019 as a new stopover landmark for both local and tourists. The major renovation at CentralWorld is progressing as planned and will gradually complete by 3Q18. Asset Enhancement
branches, contributing to the overall increase in rental and service fees. (4) Bank fees, increased by THB 15.80 million, in alignment with the increase in Branch and Online sales volumes. (5) Depreciation