rea of 5 rai, 1 d buildings l Mai Province 54 square wa d buildings Khon Kaen n, 9 square w d buildings l cels of land, with storage al of investm peration of t uction busine ent in BBB of financial red
), เทคโนโลยีระบบกัก เก็บพลังงาน (Energy Storage System) และระบบการเชื่อมต่อไฟฟ้าอัจฉริยะ (Smart Grid) ภายในเขต ส่งเสริมอุตสาหกรรมนวนคร โดยคาดว่าโครงการจะเริ่มด าเนินการได้ในช่วงต้นปี 2561 ที่ก าลังการติดตั้ง โดย
of rain-storage system, purifying machine by UV for water in manufacturing process, and water system installation and water treatment project, etc. Despite of revenue from projects decreased, revenue
base area 916.63 square meters for water storage located Moo.5 Mai Khao District, ampher Talang, Phuket Province. Currently it will valid until June 14, 2018 and GS will renew the license until
when no longer required; 2.3 consider risks of media degrading while stored information is still needed and methods on how to handle such risks in case of prolonged storage; 2.4 keep all media in a safe
storage plan in order to be sufficient for production in a longer period. Restricted deposits at financial institutions decreased by Baht 188.9 million, which are deposits with financial institutions as
. Inventories increased by Baht 121.0 million due to the change of fuel storage plan in order to be sufficient for production in a longer period. Restricted deposits at financial institutions increased by Baht
the year. Inventories increased by Baht 89.7 million due to the change of fuel storage plan in order to be sufficient for production in a longer period. Restricted deposits at financial institutions
subsidiaries had revenue from Other Income in the 2nd quarter of 2018 and 2017 for THB 2.12 million and THB 4.27 million, which consist of storage tanks rental, sales of scrap materials, interest income, gain on
. Other income The Company and its subsidiaries had revenue from Other Income in the 3rd quarter of 2018 and 2017 for THB 2.28 million and THB 4.43 million, which consist of storage tanks rental, sales of