Plant, No. 7, Soi 11, Line 3, Moo 12, Saraburi-Lom Sak Road, Chong Sarika Sub-District, Phatthana Nikhom District, Lopburi Province. CNES has submitted the best techno-commercial offer for the 2MW Solar
had signed new 8.3 MW, total accumulated capacity in pipe line are 19.7 MW which are under construction and scheduled to achieve COD in 3Q2019-1Q2020. Chonburi Clean Energy, an installed capacities of
goods sold increased in line with the increasing sales volume and the reasons as follows: 1) Electricity cost increased due to the raising of demand in Chonburi area. Moreover, the Royal Irrigation
capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. Power In 3Q2019, Solar Rooftop had signed new 3.1 MW, total accumulated capacity in pipe line are 19.9 MW
communities surrounding the factories. Moreover, OSP launched another COVID-19 support campaign “You Give Points, We Donate” for donation through M-Point, the loyalty program in LINE application platform that
situation, o Rising depreciation and amortization from investment to increase raw water distribution capacity. o However, raw water cost decreased in-line with raw water sales volume, as the Royal Irrigation
treatment plant is scheduled to achieve COD in 3Q2020 with capactity of 9,600 cubic meter per day. Power In 4Q2019, Solar Rooftop had signed new 4.0 MW, total accumulated capacity in pipe line are 24.4 MW
Baht, increased by 915.82 million Baht or 4.32% from the end of the year 2019 due to the changes in the following items: - Property, plant and equipment were 15,708.47 million Baht, increased by 447.52
dismantling of transmission line and switchyard as part of the construction of SBPL. Page 17 KEGCO: Unit : Million Baht 2019 2018 Change Increase (Decrease) Amount % Electricity revenue - Availability Payment
main facilities have already finished and on process of transmission line and communication system. The target COD is in 1H’2019. DTE1&2 solar project (Xuan Cau Project) with an installed capacity of 420