project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has
price. By the way, the Group has been compensated the increased in gas price from EGAT in form of adjusted electricity price to be in line with natural gas price. Gross Profit and Gross Profit Margin 2019
) has been applied to GHECO-One which resulted Gheco-One to levelize the AP over the contract period rather than the front-loaded AP received from EGAT according to PPA and to record the deferred revenue
price. By the way, the Group has been compensated the increased in gas price from EGAT in form of adjusted electricity price to be in line with natural gas price. Gross Profit and Gross Profit Margin 2019
project has entered into the PPA with EGAT with the contracted capacity of 514 MW and Electricite Du Laos (EDL) with the contracted capacity of 130 MW for 27 years. The construction of the project has
Nam Kading River in Bolikhamxay Province of Lao PDR. The project has entered into the PPA with EGAT with the contracted capacity of 514 MW and Electricite Du Laos (EDL) with the contracted capacity of
higher EGAT dispatch as a result of EGAT’s transmission line maintenance in 2Q2019 For 6M2020, 8 IPPs generated Baht 280.2 million of Normalized Share of Profit and Dividend, a 12.6% decrease from 6M2019
Gulf GTS1 แมว้่าปริมาณการจ าหน่ายไฟฟ้าให้ EGAT ในไตรมาส 2 ปี 2563 เพ่ิมข้ึน เน่ืองจาก EGAT ซ่อมบ ารุง สายส่งในไตรมาส 2 ปี 2562 บริษทัมีส่วนแบ่งก าไรปกติจากเงินลงทุนและเงินปันผลรับจากโรงไฟฟ้าขนาดเล็ก
Authority of Thailand (“EGAT”), which based on the principle that annual Availability Payment (“AP”) will not be lower in year of planned major maintenance, the Company expects higher Availability Payment
(EGAT) and Electricité du Laos. Currently, XPCL is in the process of construction of the Xayaburi Hydroelectric Power Project. As at January 31, 2018, the construction progress was 89.29 percent. In this