that are inconsistent with international standards or insufficient to protect investors' interest efficiently."The new Securities Law covers six areas as follows:(1) Enhancing flexibility of
treatment plant is scheduled to achieve COD in 3Q2020 with capactity of 9,600 cubic meter per day. Power In 4Q2019, Solar Rooftop had signed new 4.0 MW, total accumulated capacity in pipe line are 24.4 MW
lease under a Power Purchase Agreement 104.5 104.9 106.3 1.3% 1.7% 206.9 211.2 2.1% Cost of sales and services (1,191.7) (1,121.4) (1,168.5) 4.2% (1.9%) (2,466.2) (2,289.9) (7.1%) Gross profit 421.6 350.0
governmental support. The new PDP is expected to be completed and implemented in 2018. Page 4 Regarding the Alternative Energy Development Plan of 2015-2036 (AEDP 2015), power generation from renewable energy is
signed new 4.0 MW, total accumulated capacity in pipe line are 24.4 MW which are under construction and scheduled to achieve COD in 1Q2020-3Q2020. Power plant Type of power Category of producer Equity
transactions was 31,813 transactions per day, increasing 16.6%YoY Special note effecting to net profit The impact of the new Labor Protection Act (No.7) in the Royal Gazette for Bt2.45mn. Business Overview
forecasted to increase 6.5 percent annually. According to 2019-2028 Power Supply Business Plan (RUPTL), the government plans to expand its electricity generating capacity by 56,000 megawatts. The new RUPTL
ended 30 September 2019 and 2018 are presented below. THB Mn % (1) THB Mn % (1) THB Mn % (1) THB Mn % (1) Sales of electricity 687.9 60.2 690.2 61.1 2,030.5 59.7 2,013.8 61.7 > Biomass Power Plants 658.5
ended 30 September 2019 and 2018 are presented below. THB Mn % (1) THB Mn % (1) THB Mn % (1) THB Mn % (1) Sales of electricity 687.9 60.2 690.2 61.1 2,030.5 59.7 2,013.8 61.7 > Biomass Power Plants 658.5
Rooftop had signed new 6.5 MW, total accumulated capacity in pipe line are 20.4 MW which are under construction and scheduled to achieve COD in 2Q2020-4Q2020. Power plant Type of power Category of producer