in distribution of product and equipment, design, assembly and installation and maintenance service of pure water treatment system; as well as dialysis service of clinic business for kidney patients
of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
disclosure CRAs should make disclosure and transparency an objective of their ratings activities; and Confidential information CRAs should maintain in confidence all non-public information communicated to them
was 86%, more than the plan at 84%. When comparing with the Q4/2017 at 76% about 10% increased as the main activities such as installation of turbine unit 1 and 2, construction of spillway gates and
%, and will be shown in the income statement in next quarters. • Installation of solar rooftop at PTT petrol station GPSC is currently in the process of installing solar panels on the rooftops of PTT
. • Total investment: approximately JPY 10,000 million • SCOD: Q4/2017 Project updates: The project progress reached 91.5 %. Main activities in Area B are piling work, structure work and module installation
year 2016 ECF Holdings Company Limited, as the subsidiary of the Company by holding 75 percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan
biomass power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of tota l shares by SAFE. The Company could start
power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of total shares by SAFE. The Company could start gaining
Baht 280.97 million to Baht 292.59 million. Revenue from Installation work also decreased by 50.75%, as the sub-contracting project nearly complete. Cost of goods sold increased 4.84% in portion of