% Property, plant and equipment 538.16 23.77% 544.27 23.20% Intangible assets 1.91 0.08% 0.37 0.02% Deferred tax assets 18.28 0.81% 15.56 0.66% Other non-current assets 12.49 0.55% 11.94 0.51% Total non
services (converting solid waste into electrical energy for 25-year period started from the date of contract). As specified in the contract, the subsidiary shall transfer building, machine and equipment to
services (converting solid waste into electrical energy for 25-year period started from the date of contract). As specified in the contract, the subsidiary shall transfer building, machine and equipment to
started from the date of contract). As specified in the contract, the subsidiary shall transfer building, machine and equipment to Krabi Municipality without any charges when the contract ends. The Group’s
solid waste into electrical energy for 25-year period started from the date of contract). As specified in the contract, the subsidiary shall transfer building, machine and equipment to Krabi Municipality
investment grew 4.2% in Q4 versus the same period in 2017 and up 3.9% from Q3. Private-sector investment expenditure on machinery and equipment picked up pace and this industrial expansion is encouraging. The
992 million and THB 887 million, respectively, increased by THB 234 million or 25.8% mainly due to higher orders. 4. Property, plant and equipment Property, plant and equipment as of December 31, 2019
equipment and system and to produce a structural foundation and a lifting for the usage in Carnival Magic project. The detail of such transaction is as below; 1. Date of the Transaction The Board of Directors
-term investment) 3.82 0.20% 3.46 0.16% Property, plant and equipment 577.77 30.47% 581.77 27.46% Intangible assets 2.28 0.12% 1.74 0.08% Deferred tax assets 18.94 1.00% 16.90 0.80% Other non-current
Baht 171.9 million. The claim was compensation from the event of damaged machinery during the test run, before COD, and the Plant is COD in 2016. 5 Gross Profit and Gross Profit Margin Q1-2021 Q2-2021 Q3