operations of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis
of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical
(agreement with the Provincial Electricity Authority ) PEA .(The commercial operation date was October 11, 2011 . Head office 386, Village no.8, Mitraparb Rd., Ban Po sub- district, Muang Nakhon Ratchasima
a development project of tourist facilities on Emboodhoo Lagoon in the Republic of Maldives (“Crossroads”), by acquiring interests in a separated head lease, which covers three resorts and an
การปฏิบัติงาน (Head of Compliance) ไม่พบข้อมูล ลำดับ ชื่อ-นามสกุล วันที่แต่งตั้งมีผล {{o.Number}} {{o.FullName_TH}} {{o.AppointedDate | date: 'dd/MM/yyyy'}} ลำดับ {{o.Number}} ชื่อ-นามสกุล
-267-8222 แฟ็กซ์ 02-267-9048-9 Head Office : 88 PASO Tower, 24th Floor, Silom Road, Suriyawongse, Bangrak, Bangkok 10500 Tel: 02-267-8222 Fax: 02-267-9048-9 ส านกังานบอ่วิน : นิคมอตุสาหกรรมเหมราชชลบรีุ
-2222 แฟ็กซ์: 02-634-4114 Head Office : 88 PASO Tower, 18th Floor, Silom Road, Suriyawongse, Bangrak, Bangkok 10500 Tel: 02-634-2222 Fax: 02-634-4114 ส านกังาน : 55 หมู่ 5 สวนอตุสาหกรรม เอส เอส พี ต าบล
Engineering Co.,Ltd. Construction started within 1st quarter of 2016 (Within 31 August 2015) Operated by 1. JJ Builder & Decor Co.,Ltd. 2. Arehawks Co.,Ltd. (Head Office) 4.Realizable Value ** 182,758,080 Baht