. That the appointment of Mr. Chin-Lung Tseng as a replacement director (with authority), be approved, subject to SEC approval. 4. That the appointment of Mr. Chin-Lung Tseng, as the new Chairman of the
. KYE need a replacement new air conditioners for reduce the breakdown time, saving maintenance cost, saving energy. New air conditioners system expanding from the current air conditioners system for
. KYE need a replacement new air conditioners for reduce the breakdown time, saving maintenance cost, saving energy. New air conditioners system expanding from the current air conditioners system for
both Replacement Equipment Manufacturer (REM) and Original Equipment Manufacturer (OEM) automotive parts, as well as provides injection, chrome plating and painting services for plastic products. Top 10
million baht. The other acquisitions were for the replacement of old assets and for the efficiency improvement. In addition, other non- current assets increased 11.08 million baht mainly from mold to be
has drawn a lot of participants – now surpassing 40 brand owners. We have also granted a Transformation Loan to Strengthen Business, which features a soft loan for machinery replacement Phase 2 for
190 130 127 50% 555 383 45% Add: Non Operational/Extraordinary income/(expense) (6) 167 (1) 706% 119 87 36% Acquisition cost and pre-operative expense, (6) (7) (2) 189% (20) (7) 181% Gain on Bargain
, before extraordinary items 192 798 (76)% (13) 34 51 (125)% Add: Non Operational/Extraordinary income/(expense) (23) 21 (207)% (34) (7) 18 (288)% Acquisition cost and pre-operative expense, (26) (35) (26
/Extraordinary income/(expense) (7) (6) (8) (12%) 30 170 (83%) Acquisition cost and pre-operative expense, (7) (5) (8) (11%) (29) (32) (11%) Gain on Bargain Purchases, impairments and feasibility study(Net)1 1 (0
2,144.6 2,184.4 (39.8) (1.8) Interest expense (866.1) (1,026.8) (160.7) (15.7) Net interest income 1,278.5 1,157.6 120.9 10.4 Fees and service income 227.4 212.3 15.1 7.1 Fees and service expense (50.2