Floating Solar Power Plant for Sirindhorn Dam Hydro-Floating Solar Hybrid Pilot Project, the world’s largest hybrid hydro-floating solar power plant, with installed capacity of 45 MW and target to complete
value is derived from this method of calculation, whereby the calculation is based on the Company’s reviewed consolidated financial statements as of 30 September 2017. When combining with the transaction
, memorandums or any documents and liaison with government agencies or related regulatory agencies as well as complete any appropriate and necessary procedures However, the Company would enter into the above
Period As Of Details NGERN TID LOR PUBLIC COMPANY LIMITED 2023 Reviewed Equity Method Statement Q2 30/06/2023 NGERN TID LOR PUBLIC COMPANY LIMITED 2023 Reviewed Company Q2 30/06/2023 NGERN TID LOR PUBLIC
) 2565 สอบทาน เดี่ยว ไตรมาสที่ 1 31/03/2565 บริษัท จี แคปปิตอล จำกัด (มหาชน) 2564 ตรวจสอบ เดี่ยว งบปี 31/12/2564 บริษัท จี แคปปิตอล จำกัด (มหาชน) 2564 สอบทาน Equity Method Statement ไตรมาสที่ 3 30/09/2564
information contained in this report is true and complete in all respects. (Mr.Chalee Suksawad) Authorized Director (Mr.Arak Suksawad) Authorized Director (Authorized Director signed with the Company’s Seal
and complete in all respects. (Mr.Chalee Suksawad) Authorized Director (Mr.Arak Suksawad) Authorized Director (Authorized Director signed with the Company’s Seal affixed) Enclosure No. 2 - 1
Thailand. Method Calculation Transaction Size (%) NTA of the invested fund X proportion of the assets acquired 1. Asset Value Method (NTA) Company’s NTA 0.00 New profit of the invested funds X proportion of
report the transaction to the Stock Exchange of Thailand. Method Calculation Transaction Size (%) NTA of the invested fund X proportion of the assets acquired 1. Asset Value Method (NTA) Company’s NTA 0.00
2025 Reviewed Equity Method Statement Q2 30/09/2024 KANG YONG ELECTRIC PUBLIC COMPANY LIMITED 2025 Reviewed Equity Method Statement Q1 30/06/2024 KANG YONG ELECTRIC PUBLIC COMPANY LIMITED 2025 Reviewed