) : 36 JPY / kWh Commercial operation date : 1 September 2016 Concession life : 20 years 5) Sakura Solar Power Plant Location : Oyabe City, Toyama Prefecture, Japan Contracted capacity : 1.99 MW Installed
completed within 30 September 2018. 2. Relevant parties and relationships with the Company Buyer : Dimet (Siam) Public Co., Ltd. Seller : Electric Solutions (S) PTE Company Limited Remark ES is a limited
Tariff (FiT) : 36 JPY / kWh Commercial operation date : 1 September 2016 Concession life : 20 years 5) Sakura Solar Power Plant Location : Oyabe City, Toyama Prefecture, Japan Contracted capacity : 1.99 MW
Contracted capacity : 1.75 MW Installed capacity : 2.34 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 1 September 2016 Concession life : 20 years - 15 - 5) Sakura Solar Power Plant
on April 24, 2018 to approve the annual dividend payment for 10 2017 at the rate of Baht 5.00 per share. The interim dividend was paid on September 22, 2017 at the rate of Baht 2.00 per share with the
) (9) 45% India PET JV (September 12, 2016 onwards) 3 (0) 6 (49%) 5 7 (36%) Others (FiberVisions, PHP China, Mexico) 1 1 1 (35%) 4 3 53% 1 Previous disclose on Polyprima reflected 47.25% holding, IVL
operations at the rate of Baht 2.00 per share on September 21, 2018. Capital Adequacy Ratio (BIS ratio) As at December 31, 2018, the Capital Adequacy Ratio (BIS ratio) under Basel III, which included profit
September 2018 and deposit received for building lease, following an agreement for the development of mix-used project. Shareholders’ Equity As of 31 December 2018, Shareholders’ Equity was THB 6,078 million
excise tax and sugar tax following the Excise Act, B.E. 2560 which was effective since 16 September 2017; cost from trial runs and start-up of a new production line, driving higher yield loss; and cost
May 21, 2019 and paid the interim dividend payment for the January 1 – June 30, 2019 operations at the rate of Baht 1.50 per share on September 20, 2019. Capital Adequacy Ratio (BIS ratio) As of