service of electricity engineering. • Property, plant and equipment has increased Baht 30.22 million, as a result of assets for solar energy. • Restricted cash decreased by Baht 6 5 . 2 4 million because
Energy Industries Company Limited (subsidiary company) is in the consideration period of selecting a suitable design & construction contractor and obtaining equipment for power plant project. Relationships
parties : Vanachai Energy Industries Company Limited (subsidiary company) is in the consideration period of selecting a suitable design & construction contractor and obtaining equipment for power plant
22.28 116.67 (94.39) (80.90%) Property, plant and equipment 564.97 524.06 40.91 7.81% Goodwill 19.38 19.38 - - Intangible assets 13.68 9.44 4.24 44.92% Deferred income tax assets 3.98 4.15 (0.17) (4.10
Property, leasehold improvement and equipment as of December 31, 2018 was of Bt11,353.9 million, increasing by Bt4,149.7 million or 57.6% from December 31, 2017 Page 5 of 6 2.1.3 Project costs under
to Bt833.0 million 2.1.2 Property, leasehold improvement and equipment as of December 31, 2018 was of Bt11,353.9 million, increasing by Bt4,149.7 million or 57.6% from December 31, 2017 Page 5 of 6
lease payment amounted to Bt62.5million. Page 5 of 6 2.1.2 Property, leasehold improvement and equipment as of March 31, 2019 was of Bt11,759.2 million, increasing by Bt405.3 million or 3.5% from December
, building and equipment 147.24 149.96 (2.72) (1.81) Assets on long-term lease 96.64 99.17 (2.53) (2.55) Other non-current assets 19.76 19.20 0.56 2.90 Total assets 365.57 379.77 (14.21) (3.74) Current assets
, consisting of current assets of Bt7,597 million; property, plant and equipment of Bt9,306 million net; intangible assets of Bt274 million; investment property of Bt163 million; goodwill of Bt154 million
) Property, plant and equipment 366.10 357.14 8.96 2.51 Intangible assets 11.88 11.65 0.23 1.97 Retention receivables 31.93 37.25 (5.32) (14.27) Withholding tax deducted at source 66.61 61.31 5.30 8.65