) head south around 70 meter in Kwang Ban Chalong, Khet Bang Pli, Samutprakan with area according to title deed of 19 rai, 1 ngan, and 40 square meter. Currently is the Printing plant and Distribution
Associates or Joint Ventures. Projects under Construction Utilities WHA ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment
WHA EIE which is scheduled to achieve COD in 2Q2020 and expects to reach full capacity of 15,000 cubic meter per day by 4Q2020. While Reclaimed project at ESIE is also scheduled to achieve COD in 2Q2020
ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. WHAUP Nghe An Vietnam water
Company Limited Investment in water production and sales project for the amount of 113.88 million cubic meter At the Eureka Design Public Company Limited board meeting, 3/2020, dated March 12, 2020, the
, Thailand Tel. 66 2323 1085..96 Fax. 66 2323 9283 4.3 Liquidity adequacy Description units As of 31 December 2018 2017 Current Ratio times 5.54 7.63 Quick ratio times 3.38 4.47 Inventory turn over times 4.20
the annual dividend payment. Analysis of Liquidity. Transaction For the Year ended 31st December (Unit: Time) 2019 2018 Current Ratio 6.27 5.86 Quick Ratio 3.64 2.81 Inventory Turnover 3.22 2.91
Baht. 9. Key Financial Ratios Key Financial Ratios As of 30 Jun 2016 As of 30 Jun 2017 Liquidity Ratio Current ratio (time) 0.35 0.30 Quick ratio (time) 0.34 0.29 Cash flow ratio (time) 0.82 0.65
adequacy Description units As of 31 December 2017 2016 Current Ratio times 7.63 4.27 Quick ratio times 4.47 2.82 Inventory turn over times 4.71 4.76 Average debt collection days 79 80 Current ratio was
5.90 5.83 Quick Ratio 3.08 3.17 Inventory Turnover 3.37 3.26 • Current ratio was 5.90 times, increased from the year 2016 which was equivalent to 5.83 times because current assets and current liabilities