150,000 ridership per day. • In this quarter, MACO has installed 42 additional digital screens at Kuala Lumpur International Airport Terminal 1 and 2. These screens are well-positioned to capture more than
, the company received orders from a local customer to install such products with a cooling machine at the factory building with a value of 10 .50 million baht which is expected to be installed and
holds for 10% of shares, manages its business system and has the services of online top-up of Boonterm on the machine will be installed 4,000 machine within this year. The Company continues to focus on
was also an expense for holding shareholder’s meeting in April 2019. Depreciation expenses also increased from 3 new vehicles that were acquired in late of 2018 and machines that installed in 2nd
(ECF-P) as the Company’s subsidiary holds 20 percent of total shares of GEP. At present, the project has operated commercially for the 1st phase with installed capacity 50MW since 27 September 2019. Now
, representing an increase of 145.1% because of in 2021, the Company has received a project for equipment for lease, so it invested in equipment for lease which installed the equipment and delivered the project at
Significant events for 2020 to present The acquisition and transfered of 3 biomass power plant companies with total installed power generation capacity of 26.9 MW from UA Withya Public Company Limited On 21
Billboards, Nationwide Billboards and PTT Posters (Billboard in PTT Jiffy gas station) with the total billboards of over 1,229 panels installed at key strategic locations where heavy traffic congestions and
completed and expect to installed in Q4/2020. The engineering design, construction and system testing are on schedule. SPP Replacement - Stage 1 | Glow Energy Phase 2 Projects Electricity Capacity (MW) Steam
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and