for LPG storage tanks and non-pressure tanks on a leased land, located in Thilawa Special Economic Zone near Yangon, Myanmar. Expected project schedule is one year start from early next year and
Value LAK 2,000/share Shareholding 1. UAC Energy 50.01% 2. SBANG SE 29.99% 3. KMG 20.00% 4.2 Project Investment VWM is located in Vientiane, Lao PDR on concession area of KMG with total investment value
City Development Project, with the project details as follows Project name U-Tapao Airport and Eastern Aviation City Development Project Project’s location The project is located at Ban Chang District
cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province. The project has entered into
THB 114.6 Mn to THB 126.7 Mn respectively, an increase of THB 12.1 Mn or 10.6%. This increase was mainly due to (1) increased staff to support the expansion of branch for both the restaurants which the
expansion. In total, the Group opened a total of 100 new branches, divided into 71 equity branches owned by the Group and 29 franchise branches both domestic and international. Most new branches were under
mainly from the increase in revenue from dessert café, which was attributed to the expansion of 7 new stores from Q3/2018 and a rise in Same-Store-Sale-Growth (SSSG). Gross Profit and Gross Profit Margin
38.3 12.7 14.5 33.5 For the 3-month period ending 31 Mar 17 31 Mar 18 Note: 1/ Energy Drinks and Sport Drinks 2/ Drinking Water, 3-in-1 Coffee and RTD Coffee The capacity expansion projects to support
offering 141,896mn U-W4 warrants at no cost to existing shareholders who subscribed to the rights offering 27 March 2018: The Company completed the disposal of land plots located on Charansanitwong Road for
35 large- format digital billboards located in the CBD of upcountry urban areas. These above-mentioned developments have already borne fruit in the form of our solid performance since 2017 and