THB 325 million in correspondence to the group’s asset restructuring. Without this non-recurring gain, total revenue was THB 5,245 million, a 3.3% decrease from 2016. The decline was attributable to the
generate higher income, and this scheme will complete at the end of this year. The usage amounts from money transfer are continually growing driven by a decrease of the number of banks’ branch then customers
as following; Rental and Services Income and Other Income Rental and Service income for 2018 was 628.7 million baht lower than 2017 of 79.3 million baht This was because revenues from ITJ decrease from
period was 339.5 million Baht a decrease by 2.3% from the same period last year. JAS Asset Management Discussion and Analysis, Q2/2019 Page2/4 Cost of Rental and Service Income The Company incurred rental
1 G.K. (ISP1) is a solar power producer located in Ichinoseki, Iwatae, Japan. Its installed capacity is 25.881 Megawatt, in which GPSC had hold the share with 99% portion or 25.62 equity Megawatt. The
million compare with performance for the prior year appear as comprehensive operating net Profit of the Company THB 122.62 million, decrease in Profit from the prior year THB 118.61 million, due to the
industrial waste to energy power plant project located at Ratchaburi Industrial Estate and operated by Progress Interchem (Thailand) Co., Ltd. (“Interchem”) with a contracted capacity of 4.0 MW (an installed
structure, machinery, materials equipment and non-used equipment, etc. of Tak Smelting Plant located at No. 94, Moo 1, Nong Bua Tai Sub-district, Muang District, Tak Province to Strega whilst Strega is
cannot be sold at market price. Moreover, subsidiary of UWC located at Buriram Province started to 2 sell electricity as a result, the cost is higher than normal operation at the meantime quarter 1-2018 no
% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic