-2022 6M-2021 6M-2022 Sales and service income THB Mn THB Mn THB Mn %QoQ %YoY THB Mn THB Mn %YoY Sales of electricity - FiT, base tariff and Ft 770.9 806.7 821.3 1.8% 6.5% 1,497.9 1,628.0 8.7% FiT Premium
are solar projects which achieved COD in December 2015 with total installed capacity of 46.5 MW, FiT 5.66 Baht/kWh and sells all electricity to PEA under a 25-year PPA. Successful commercial operation
Project. equal to 38. fit for the se gross marg in of 21.36% second qua second qu as 66.94 mi incurred in ec-16 70.06 33.54 96.48 507.30 ,260.91 134.08 ,264.92 13.28 140.21 73.76 386.48 creasing in 54
The Securities and Exchange Commission (SEC) held a meeting with the Department of Climate Change and Environment (DCCE), the Ministry of Natural Resources and Environment (MNRE), the Thailand
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe
, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar
as follows: 1) Kuno Solar Power Plant Location : Kuno City, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW - 14 - Feed-in Tariff (FiT) : 36 JPY / kWh Commercial
three-month period ended Q1-2020 Q1-2019 Change 2020 2019 THB Mn % Sales of electricity - FiT 623.1 580.4 42.7 7.4 FiT Premium 43.7 42.6 1.1 2.6 Sales of electricity to Industrial Users (IU) 4.7 2.4 2.3
three-month period ended Q1-2020 Q1-2019 Change 2020 2019 THB Mn % Sales of electricity - FiT 623.1 580.4 42.7 7.4 FiT Premium 43.7 42.6 1.1 2.6 Sales of electricity to Industrial Users (IU) 4.7 2.4 2.3
PUBLIC COMPANY LIMITED Disclosure Business News ( 4 record(s) found) Date Time Heading Link 17/08/2020 18:07 Notification of the Resolutions of the Board of Directors Approving Change of Interim Dividend