Fabrication and Other Services. As at 30 June 2019, the Group has backlog for construction service in oil and gas sector totaling of 1,814.43 Million Baht. On 18 July 2019, the Company also notify the project
Million Baht, accounting for 24.52% compared to the same period of previous year. As at 30 September 2018, the Group has backlog for construction service in oil and gas sector totaling of 2,425.30 Million
(1.93) (0.61) Intangible assets 9.13 2.90 6.22 214.34 Retention receivables 5.49 17.85 (12.36) (69.23) Withholding tax deducted at source 27.45 36.56 (9.11) (24.92) Deposits 0.95 0.77 0.18 23.64 Deferred
(1.93) (0.61) Intangible assets 9.13 2.90 6.22 214.34 Retention receivables 5.49 17.85 (12.36) (69.23) Withholding tax deducted at source 27.45 36.56 (9.11) (24.92) Deposits 0.95 0.77 0.18 23.64 Deferred
of the Company was recorded at THB 4,721.30 million. The small drop in shareholders’ equity of 0.87% was mainly due to increasing other components of equity offset with a result of the recent dividend
comprehensive income for the period of 40.37 Million Baht, while dividend payment of the Group during 2019 totaling of 49.35 Million Baht. As at 30 Sep 2019, the Group’s Current ratio was 1.50 times which mean
million. Furthermore, the company received corporate income tax returns in the amount of THB 671 million from 2009 and 2010. Other Important Events in Q3/2017 The company paid 2017 interim dividend by the
and warrants (FVC-W1) at Baht 11.90 million and stock dividend amounting Baht 11.76 million. And Retained earnings decrease from annual dividend payment amount Baht 13.09 million and losses from
the same level, slightly increased. Moreover, there were major overhaul maintenance of Sriracha plant and planned maintenance of IRPC-CP, plus the drop in dividend income from Ratchaburi Power Company
the same level, slightly increased. Moreover, there were major overhaul maintenance of Sriracha plant and planned maintenance of IRPC-CP, plus the drop in dividend income from Ratchaburi Power Company