Branch in Phnom Penh In October 2024, the Company opened its first After You dessert Café in Cambodia, located in Phnom Penh, which was well-received by customers. The Company continues to seek for new
, in any case, shall require the presence of shareholder(s) representing at least 50 percent of the total issued shares in Hello LED consisting of at least 1 representative from each of the Existing
the total issued shares in Hello LED consisting of at least 1 representative from each of the Existing Shareholders and the Company. Resolution After the completion of the Transaction, the requirement
% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
ใหญ ่ 9 (2) มีตัวแทน (local representative) ของผู้รับผิดชอบในการด าเนินการซึ่งเป็น บริษัทหลักทรัพย์ที่ได้รับใบอนุญาตให้ประกอบธุรกิจหลักทรัพย์ หรือเป็นส านักงานตัวแทน ในประเทศไทย (representative office
percent as calculated based on the total value of consideration criterion, which gives the highest transaction value (the “Disposal Transaction”): (1) 16 plots of vacant land located on Charan Sanit Wong
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53