Branch in Phnom Penh In October 2024, the Company opened its first After You dessert Café in Cambodia, located in Phnom Penh, which was well-received by customers. The Company continues to seek for new
% ownership interest.), is a hydro power plant project, Run-of-River, with the capacity of 1,285 MW. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic
Company Limited (BIC) Phase 2 is a gas-fired SPP Cogeneration, located in Bangpa-In Industrial Estate, Phra Nakhon Si Ayutthaya Province, with capacity of 117 megawatts of electricity and 20 tonnes per hour
% ownership interest.), is a cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
no. 2182 and 3802 having total area of 23 rai, 32 Sq.wah.) and structure located on Bang Na-Trad Km.29.5 241.67 361.85 371.52 2 Machine and Printing Equipment 268.86 345.60 348.73 Total value 510.53
. Balance at end 25x1 x x x x x x x (x) x x /1In case of the company have both ordinary share and preferred share, it shall separate ordinary share and preferred share. And in case of having both a surplus
of the company have both ordinary share and preferred share, it shall separate ordinary share and preferred share. And in case of having both a surplus and a deficit, it shall demonstrate such items
25x1 x x x x x x x (x) x x /1In case of the company have both ordinary share and preferred share, it shall separate ordinary share and preferred share. And in case of having both a surplus and a deficit